|
Museum Period Room Documentation
Boston, Massachusetts
A local museum
planned to undertake a major renonvation and addition. As part of the
construction process, the museum's American and European period rooms were
to be deinstalled, stored, and later reconstructed in the new museum space.
Our firm was retained to document the eighteen rooms' condition through
a series of detailed measured drawings. The drawings would then be used
in the reinstallation of the rooms once construction on the new museum space
is complete.
Below is a sample of some of the rooms:
|
|